1

Network Bandwidth Calculator — Link & Transmission

cams
Mbps
Mbps
×
×
×
Recording Throughput (T_rec)
552.0
Mbps
Live View Throughput (T_live)
4.6
Mbps
Total Expected Throughput (T_total)
556.6
Mbps
Recording
552 Mbps
Live View
4.6 Mbps
Total vs Uplink
55%
Formula: T_rec = N × B_main × F_rec × F_oh  |  T_live = N × B_sub × F_live × F_oh  |  T_total = T_rec + T_live  |  Uplink utilization should not exceed 70% at peak.
2

Storage Capacity Calculator — Scale & Capacity

cams
Mbps
days
h/day
×
×
Raw Video per Day
3.38
TB / day
Required Usable Capacity
121.7
TB usable
Required Raw Disk Capacity
152.1
TB raw disks
Suggested Disk Configuration
10× 18TB
RAID6 configuration
Raw Video Data
101 TB
+ FS Overhead
+10%
+ Safety Margin
+20%
Raw (RAID overhead)
152 TB
Formula: Raw/day = N × (B_avg/8) × 3600 × H / (1024²) TB  |  C_usable = Raw/day × D × F_fs × F_safe  |  C_raw = C_usable / E_raid
3

PoE Power Budget Calculator — Power Distribution & Energy

cams
W
W
W
×
Average PoE Load
240
W average
Peak PoE Load (with headroom)
450
W peak × F_head
Budget Check (Peak × F_head vs Budget)
450W vs 370W
CHECKING
Per-Port Class Check (P_peak vs Max Port W)
15W vs 30W
CHECKING
UPS Sizing Contribution (This Switch)
308
W (switch base + avg load × 1.1)
Avg Load vs Budget
65%
Peak×Headroom vs Budget
122%
Formula: L_avg = N_sw × P_avg  |  L_peak = N_sw × P_peak  |  Check: L_peak × F_head ≤ P_budget  |  UPS = (switch_base + L_avg) × 1.1  |  Target: <80% sustained utilization.
4

Camera Coverage & Pixel Density Calculator

mm
m
m
Horizontal Field of View
53.1°
degrees
Coverage Width at Ground Level
2.73
meters wide
Pixels per Meter at Ground
703
px/m
Pixels on License Plate
365
px on plate width PASS
Max Distance for Required Pixels
6.2
meters from camera
Plate Pixels vs Minimum
365px / 120px min
Coverage vs Lane Width
2.73m / 4.0m lane
Formula: HFoV = 2 × arctan(sensor_width / (2 × focal_length))  |  Coverage = 2 × height × tan(HFoV/2)  |  PPM = H_pixels / coverage_width  |  Plate_px = PPM × plate_width
5

UPS Runtime & Battery Sizing Calculator

W
%
Ah
strings
%
Total Battery Energy
3.12
kWh (usable)
Actual Load on Battery (incl. UPS losses)
1304
W drawn from battery
Estimated Runtime
144
minutes
Meets 30-min Requirement?
YES
PASS
Recommended UPS VA Rating
1.74
kVA (at 0.9 PF, +20% margin)
Runtime vs 30-min req
144 min
Battery Energy Used
80% DoD
Formula: Energy_usable = V × Ah × Strings × DoD% / 1000 kWh  |  Actual_load = IT_load / (efficiency/100)  |  Runtime = (Energy_usable × 60) / (Actual_load/1000) minutes  |  Minimum 30 min for core; 15 min for edge.